From May 16 to July 13, 2025, network construction will be carried out in Building 10 at Yotsuya Campus.
We apologize for any inconvenience this may cause and appreciate your understanding and cooperation.
Note: For university-wide events and reservations made before this announcement, we will proceed with consideration for their use.
【Details】:
Replacement and expansion of network switches and wireless LAN access points.
【Work Period】:
Scheduled from Friday, May 16, 2025, to Sunday, July 13, 2025.
Note: No work will be conducted in rooms already reserved through the “Classroom and Conference Room Reservation System” during the reservation dates.
【Scheduled Wired LAN Network Outage Dates】:
Basement 1 | June 15 (Sunday) |
Auditorium (1st to 2nd floors) | June 21 (Saturday) |
3rd to 6th floors | June 14 (Saturday) |
【Scheduled Wireless LAN Network Outage Dates】:
Sequential replacement starting on June 14 (Saturday). A detailed schedule is being adjusted and will be updated once finalized.
【Other Information】:
- The scheduled wired and wireless network outage dates are tentative and subject to change. Any changes will be updated in this notice.
- During the work period, workers will enter and exit hallways and storage areas.
- Some offices and conference rooms have access points installed on the ceiling. Workers may enter these rooms on weekends and holidays for replacement and installation.
- For floors 4 to 6, work will primarily be conducted in the hallways, including weekdays.
- Please excuse any noise while removing or installing access points.